Chard Leisure Centre

New build leisure centre and swimming pool

Project

Chard Leisure Centre

 

Speller Metcalfe was appointed through the UK Leisure framework to deliver a scheme as part of the Chard Regeneration project for South Somerset District Council.

The project is part of a wider scheme to bring the historic Grade II-listed Boden Mill site bought back into use, with a central focus as the new leisure centre and swimming pool.

The £14m scheme included:

  • Demolition of existing industrial buildings at the Boden Mill Site (carried out by Speller Metcalfe as a separate enabling works package);
  • Site diversions including partial diversion of a historic brick culvert;
  • Construction of the new build, one and two-storey leisure centre, including a state-of-the-art 50-60 station gym, a 25-metre swimming pool and learner pool, various exercise and fitness studios, an adventure play facility and a café;
  • Associated drainage and hard and soft landscaping, including public realm areas;
  • Extension of existing car park.